INSP-Final Inspection | 9/22/2015 | 9/23/2015 | 9/23/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 9/8/2015 | 9/8/2015 | 9/8/2015 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test and rough to cover of the third floor passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 8/19/2015 | 8/20/2015 | 8/20/2015 | A | PART |
Jim Page
|
|
|
Notated area's approved for with red ink on the city approved drawings. Area's inspected, male & female entry/restrooms on 3rd floor.
|
INSP-Sprinkler Rough-in/Hydro | 5/5/2015 | 5/6/2015 | 5/6/2015 | A | PASS |
Katie Marron
|
|
|
1st floor hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 5/4/2015 | 5/5/2015 | 5/5/2015 | A | PART |
Troy Cobbley
|
|
|
First floor hydro test failed. Rough-in passed. Contractor to provide sheet rock on exposed wood at accordian door. And per contractor there will be no storage of paper in the Copy Center there fore light hazard spacing is ok.
|
INSP-Sprinkler Rough-in/Hydro | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | PASS |
Troy Cobbley
|
|
|
Second floor hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Matt due to leaks
|
INSP-Sprinkler Rough-in | 4/16/2015 | 4/16/2015 | 4/16/2015 | P | PASS |
Troy Cobbley
|
|
|
Second floor sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 3/18/2015 | 3/18/2015 | 3/18/2015 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for Womens Restroom, first floor, where piping is ok to cover as marked "ok" on the city approved plans.
|
INSP-Sprinkler Rough-in | 3/9/2015 | 3/9/2015 | 3/10/2015 | P | PASS |
Troy Cobbley
|
|
|
See city approved plans for locations marked ok where piping can be covered. Areas include mens and womens showers
|
Permit Ready to Issue | | | 2/12/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/12/2015 | | 2/12/2015 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 2/11/2015 | | 2/11/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/11/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2015 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 2/10/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/10/2015 | | 2/10/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 2/4/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 4 2015 9:07AM
|