INSP-Final Inspection | 6/10/2019 | 6/12/2019 | 6/12/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
John Phone #: ###-####
|
INSP-Conference | 2/8/2018 | 2/9/2018 | 2/9/2018 | P | DONE |
Jim Page
|
|
|
Fire conferenc complete.
|
INSP-Sprinkler Rough-in | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover/tenting insulation complete for entire project, all area's approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 10/21/2015 | 10/21/2015 | 10/21/2015 | P | PASS |
Jim Page
|
|
|
Attic space insulation/tenting verified, all area's approved for cover.
|
INSP-Sprinkler Rough-in | 9/14/2015 | 9/15/2015 | 9/15/2015 | A | PART |
Jim Page
|
|
|
Rough in inspection passed/complete, first floor and basement level approved for cover, need to verify insulation installation on upper level before cover can be approved.
|
Sprinkler Plan Check | 2/23/2015 | | 2/23/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/23/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/23/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/23/2015 | | 2/23/2015 | | DONE |
Kristal Soland
|
|
|
|
Intake Approval | | | 2/12/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/12/2015 | | 2/12/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/12/2015 | | 2/12/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 2/12/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 2/12/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 2/5/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 5 2015 8:51AM
|