Description
[SLRMC Vault Expansion] – Quick Permit
Relocate an existing 2" basement floor control 12'-0" due to the bottom of the stairwell being demolished for future basement expansion.

Fire sprinkler system used for floor level over 55 feet above grade. To expand the basement of the MSTI building by about 3,500 square feet and to expand the 1st story by about 430 square feet. The expansion area is to be used as a medical outpatient clinic and will house a TrueBeam Accelerator and supporting functions. No one is expected to be rendered incapable of self-preservation by the services provided. The grading and shoring work was done under grading permit GRD14-00030. Work is to include concrete footings, concrete foundations, concrete roof, an egress stairway and bulkhead, brick veneer, EIFS, interior nonbearing walls, interior doors, suspended acoustical ceilings, millwork, and finishes. Special Inspection is required for concrete, welding, bolting, soils, deep foundations, and epoxy anchors. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13, including quick-response sprinkler heads, and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/24/20157/24/20157/24/2015PPASS
DetailsJim Page
Fire sprinkler inspection passed/complete
Permit Ready to Issue  3/2/2015 DONE
Issue and Print Permit  3/2/2015 DONE
Permit Ready to Issue  2/9/2015 DONE
Issue and Print Permit  2/9/2015 DONE
Inspection Record Card- Fire2/9/2015 2/9/2015 DONE
DetailsBrittany Hill
(F) Reprint permit  2/9/2015 DONE
Inspection Record Card- Fire2/9/2015 2/9/2015 DONE
DetailsBrittany Hill
Intake Approval  2/6/2015 PASS
Plan assigned to (Tim)2/6/2015 2/6/2015 DONE
DetailsTim Frost
Sprinkler Plan Check2/6/2015 2/6/2015 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  2/6/2015 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  2/6/2015 DONE
DetailsTim Frost
Application received  2/5/2015 DONE
Application submitted via PDS Online on Feb 5 2015 10:16AM