INSP-Final Inspection | 2/18/2015 | 2/23/2015 | 2/23/2015 | A | PASS |
Forrest France
|
|
|
Scope of fire alarm work completed and passed functional testing. Permit finaled.
|
Permit Ready to Issue | | | 2/12/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/12/2015 | | 2/12/2015 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 2/11/2015 | | DONE |
|
|
|
|
Alarm Plan Check | 2/11/2015 | | 2/11/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/11/2015 | | DONE |
|
|
|
Quick permit approved with no review comments. Projectdox updated.
|
Application received | | | 2/6/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 6 2015 9:25AM
|
Plan assigned to (Lee) | 2/6/2015 | | 2/6/2015 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 2/6/2015 | | FAIL |
|
|
|
Review failed due to lack of information. I emailed Dale Hurd to let him know that ceiling heights and slope calculations will need to be provided to determine heat detector spacing requirements. Also, a scaled drawing will be required with this information.
|