INSP-Final Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit final approved.
|
INSP-Final Inspection | 3/17/2015 | 3/17/2015 | 3/19/2015 | P | PART |
Forrest France
|
|
|
Final pending current annual inspection, need to verify appropriate temp head in the vicinity of the unit heater at the new addition.
|
INSP-Sprinkler Rough-in/Hydro | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test and rough-in passed. Needing tie-ins and demo of existing riser
|
Permit Ready to Issue | | | 3/2/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/2/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 3/2/2015 | | 3/2/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Miscellaneous action | | | 2/27/2015 | | PEND |
|
|
|
I asked the following questions. (See response letter in documents)
Additional information is required before the review can continue. Please, see questions below:
• Why is the building 20’ high to only store less than 12’?
• Rocky Mountain Packaging appears to use plastic for the packaging. How high do they store the plastic?
• Are pallets used for shipping? If so where are the empty pallets being stored?
• Do you have any photos of their current operation for reference? The photos on their web site do not match their current operation. They show ceilings without sprinklers, however, the drawing show the entire area sprinklered with upright sprinklers.
• The website would seem to indicate they use expanded and non-expanded plastics in their packaging operations. Where and how do they store these plastics?
I need to be able to verify OHII is adequate for the design criteria.
I need specific answers in writing please, for the file.
Thank you for your time and help in this matter.
|
Sprinkler Plan Check | 2/27/2015 | | 2/27/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/24/2015 | | 2/24/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 2/24/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 2/24/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 2/23/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/23/2015 | | 2/23/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 2/6/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 6 2015 12:26PM
|