INSP-Final Inspection | 5/8/2015 | 5/11/2015 | 5/8/2015 | A | PASS |
Katie Marron
|
|
|
Inspection completed on 5/8/2015 in place of fire life safety requested schedule. Scope of work complete. Permit finaled.
|
Sprinkler Plan Check | 5/7/2015 | | 5/7/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/7/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/7/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/7/2015 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 5/5/2015 | 5/6/2015 | 5/6/2015 | A | PASS |
Katie Marron
|
|
|
Sprinkler system addition from 4" main to new bays was isolated and hydrostatic test passed. Rough-in complete.
Field verified appropriate use of 12 high temperature heads within 7' of radiant heaters.
Changes in field were made, resubmittal is under review. Per phone call with Tim Frost, storage room ok.
|
Sprinkler Plan Check | 2/27/2015 | | 2/27/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/27/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/27/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/27/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/27/2015 | | 2/27/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/26/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/26/2015 | | 2/26/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 2/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 10 2015 1:11PM
|