INSP-Final Inspection | 3/25/2015 | 3/27/2015 | 3/27/2015 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final walkthrough.
|
INSP-Sprinkler Rough-in | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PART |
Forrest France
|
|
|
Fire sprinkler system modifications approved for cover at the drop ceilings per the scope of work.
|
Permit Ready to Issue | | | 2/12/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/12/2015 | | 2/12/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/11/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/11/2015 | | 2/11/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/11/2015 | | 2/11/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/11/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 2/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 10 2015 4:37PM
|