INSP-Final Inspection | 4/25/2016 | 4/25/2016 | 4/25/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Supply line flush | 4/20/2016 | 4/21/2016 | 4/21/2016 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled, incorrect FIR permit request
|
INSP-Sprinkler Rough-in | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | CANC |
Jim Page
|
|
|
Inspection request was for a different FIR permit, inspection request cancelled.
|
INSP-Final Inspection | 2/25/2015 | 2/26/2015 | 2/26/2015 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler work approved for cover.
|
INSP-Sprinkler Rough-in | 2/24/2015 | 2/25/2015 | 2/26/2015 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications per the scope of work okayed for ceiling cover.
|
Intake Approval | | | 2/23/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/23/2015 | | 2/23/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/23/2015 | | 2/23/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/23/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/23/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/23/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/23/2015 | | 2/23/2015 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 2/19/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 19 2015 4:07PM
|