INSP-Final Inspection | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work completed and passed final walkthrough.
|
INSP-Sprinkler Rough-in | 3/30/2015 | 3/31/2015 | 4/1/2015 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler work per approved plans okayed for cover.
|
Inspection Record Card- Fire | 3/13/2015 | | 3/13/2015 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 3/13/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/12/2015 | | 3/12/2015 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 3/12/2015 | | DONE |
|
|
|
|
Intake Approval | | | 3/10/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/10/2015 | | 3/10/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/10/2015 | | 3/10/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/10/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 3/4/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 4 2015 7:25AM
|