INSP-Final Inspection | 8/3/2015 | 8/3/2015 | 8/3/2015 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 8/3/2015 | 8/3/2015 | 8/3/2015 | P | PASS |
Jim Page
|
|
|
Fire sprinkler riser inspected, rough in inspection passed/complete
|
INSP-Sprinkler Rough-in | 4/8/2015 | 4/8/2015 | 4/8/2015 | P | PASS |
Tim Frost
|
|
|
Sprinkler rough in passed. The riser was not installed. The fitter indicated the insulation is on the roof deck therfore, the attic is heated. No tenting was required.
|
Intake Approval | | | 3/17/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/17/2015 | | 3/17/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/17/2015 | | 3/17/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/17/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/17/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/17/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/17/2015 | | 3/17/2015 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 3/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 10 2015 7:44AM
|