INSP-Final Inspection | 10/5/2015 | 10/6/2015 | 10/6/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | FAIL |
Troy Cobbley
|
|
|
Tried to retest the electric alarm bell and found the the backflow preventor appears to be "cycling" and not allowing the flow switch to activate.
|
INSP-Final Inspection | 10/1/2015 | 10/5/2015 | 10/5/2015 | P | FAIL |
Troy Cobbley
|
|
|
Need test papers and tags for riser, bell did not work. Forward flush passed.
|
INSP-Final Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 8/31/2015 | 9/1/2015 | 9/1/2015 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Lay-in tile can be installed at pendants.
|
INSP-Sprinkler Rough-in/Hydro | 7/15/2015 | 7/15/2015 | 7/15/2015 | P | PASS |
Jim Page
|
|
|
Overhead sprinkler piping hydrostatic test passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | PASS |
Jim Page
|
|
|
Rough-in inspection passed/complete, still needs hydrostatic test on overhead piping
|
INSP-Supply line flush | 6/25/2015 | 6/26/2015 | 6/26/2015 | A | DONE |
Jim Page
|
|
|
Supply line flush complete
|
INSP-Sprinkler Rough-in/Hydro | 5/12/2015 | 5/13/2015 | 5/13/2015 | A | PASS |
Katie Marron
|
|
|
Underground hydro pass. System did loose 5 psig over 2 hours which is in the allowable ranger per code.
|
INSP-Sprinkler Rough-in/Hydro | 4/2/2015 | 4/2/2015 | 4/2/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground rough-in passed. Piping can be covered
|
INSP-Sprinkler Rough-in | 4/1/2015 | 4/2/2015 | 4/2/2015 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
INSP-Sprinkler Rough-in | 4/1/2015 | 4/1/2015 | 4/2/2015 | P | CANC |
Troy Cobbley
|
|
|
Requested for wrong date
|
Permit Ready to Issue | | | 3/25/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/25/2015 | | DONE |
|
|
|
|
Intake Approval | | | 3/24/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/24/2015 | | 3/24/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/24/2015 | | 3/24/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 3/24/2015 | | FAIL |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/24/2015 | | 3/24/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/24/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/24/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/24/2015 | | 3/24/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 3/20/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 20 2015 2:40PM
|