INSP-Final Inspection | 9/29/2015 | 9/30/2015 | 9/30/2015 | A | PASS |
Jim Page
|
|
|
Final alarm inspection passed/complete
|
INSP-Alarm Testing | 5/29/2015 | 6/1/2015 | 6/1/2015 | P | DONE |
Troy Cobbley
|
|
|
Inspection was a conference to verify device locations.
|
Permit Ready to Issue | | | 4/2/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/2/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/2/2015 | | 4/2/2015 | | DONE |
Kristal Soland
|
|
|
|
Plan assigned to (Lee) | 3/30/2015 | | 3/30/2015 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/30/2015 | | PASS |
|
|
|
|
Alarm Plan Check | 3/30/2015 | | 3/30/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/30/2015 | | DONE |
|
|
|
Plans approved with review comments. Projectdox updated.
|
Application received | | | 3/27/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 27 2015 3:29PM
|