INSP-Final Inspection | 6/10/2015 | 6/12/2015 | 6/12/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 5/29/2015 | 5/29/2015 | 5/29/2015 | P | PASS |
Troy Cobbley
|
|
|
rough-in passed. Piping can be covered.
|
Intake Approval | | | 4/2/2015 | | PASS |
|
|
|
|
Plan assigned to (Lee) | 4/2/2015 | | 4/2/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/2/2015 | | 4/2/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/2/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/2/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/2/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/2/2015 | | 4/2/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 4/1/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 1 2015 9:38AM
|