Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR15-00208
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 818 W IDAHO ST
Project NameTHE LUNCH BOX TI
Customer Number 
ePlanReviewYes
Description
Install new sprinklers to accommodate the new TI wall and ceilings

The fire sprinkler system is used for building area increase, for story increase, and for fire area. To remodel an existing building for a new full-service, speed-wax salon and office tenant. The basement has a floor area of about 1,888 square feet and is NOT approved for occupancy (considered to be an unoccupied crawlspace having some mechanical equipment). The wax salon is located on the 1st story and has a floor area of about 2,029 square feet. The 2nd story has a floor area of about 4,382 square feet and will have a reception area, waiting areas, offices, and a conference room. Work includes interior nonbearing walls, 3 single user restrooms accessible to the disabled, interior doors, interior windows, suspended acoustical ceilings, gypsum board ceilings, millwork, finishes, exterior storefront glazing, exterior windows, exterior doors, and exterior plaster. An elevator will be installed in conjunction with this permit. Structural work that was started about 5 years ago without a permit will be completed under this permit. Structural work includes new joists attached to existing joists, new beams, new beam hangers, new columns, concrete anchors, and a steel pan deck to support a new concrete slab. Special Inspection is required for epoxy anchors, for Titen anchors, and for welding. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 (including quick-response sprinklers where required) and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/14/20158/17/20158/17/2015APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in8/3/20158/4/20158/4/2015APASS
DetailsJim Page
First floor rough to cover inspection passed/complete, entire first floor approved for cover.
INSP-Sprinkler Rough-in6/25/20156/26/20156/26/2015APART
DetailsJim Page
Front entry inspected, notated in red on city approved drawings area approved for cover
INSP-Sprinkler Rough-in6/24/20156/25/20156/25/2015APART
DetailsJim Page
Entire Second floor approved for cover
INSP-Sprinkler Rough-in6/2/20156/3/20156/3/2015APASS
DetailsJim Page
Spoke with Don from TVFP for a cover-up inspection, confirmed area and look at first floor, under stair landings, south side of tenant space. Area approved for cover, notated in red the area and date on the onsite approved plans.
INSP-Sprinkler Rough-in5/27/20155/27/20155/27/2015PPASS
DetailsJim Page
Met Don F. with Treasure Valley Fire, verified area's that was wanting to be covered. Notated the on site approved drawings area's allowed for cover.
INSP-Sprinkler Rough-in5/20/20155/21/20155/21/2015APART
DetailsScott Arellano
Partial Rough in inspection; 2nd floor only. 1st floor not ready. Correction items at 2nd floor include:
1) Missing 1 inch outlet in North mechanical room;
2) Sky light areas show 4 SSP's on plans, however, only 3 SSP's installed per area;
3) South/East floor area missing SSU protection between Beam and new interior room;
4) Unprotected combustible spaces between south windows and newly constructed soffit along entire building South wall. To be verified with plans examiner;
5) 200 degree temp SSP's mixed with 165 temp SSP's within same compartment throughout 2nd floor.
Intake Approval  4/6/2015 PASS
Plan assigned to (Tim)4/6/2015 4/6/2015 DONE
DetailsTim Frost
Sprinkler Plan Check4/6/2015 4/6/2015 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  4/6/2015 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  4/6/2015 DONE
DetailsTim Frost
Permit Ready to Issue  4/6/2015 DONE
Issue and Print Permit  4/6/2015 DONE
Inspection Record Card- Fire4/6/2015 4/6/2015 DONE
DetailsCandy A. Nichols
Application received  4/3/2015 DONE
Application submitted via PDS Online on Apr 3 2015 1:40PM