Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR15-00223
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 8860 W SHELLIE LN
Project NameBreckenwood 4 plex #9
Customer Number 
ePlanReviewYes
Description
[Breckenwood Four Plex, Building #9]
The fire sprinkler scope of work consists protecting a two level four-plex apartment unit as 13R. Extended coverage sprinklers and CPVC piping is being utilized.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/9/20159/10/20159/10/2015PPASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro8/18/20158/19/20158/19/2015APASS
DetailsTroy Cobbley
Overhead hydro test passed
INSP-Sprinkler Rough-in/Hydro8/13/20158/13/20158/13/2015PFAIL
DetailsTroy Cobbley
Above ground hydro test failed due to visible loss at guage
INSP-Sprinkler Rough-in/Hydro8/12/20158/12/20158/12/2015PCANC
DetailsTroy Cobbley
Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Supply line flush7/28/20157/29/20157/29/2015APASS
DetailsTroy Cobbley
Underground flush passed
INSP-Sprinkler Rough-in7/27/20157/28/20157/28/2015PPASS
DetailsTroy Cobbley
Sprinkler rough-in and tenting inspection passed. Piping can be covered.
INSP-Sprinkler Rough-in6/10/20156/10/20156/10/2015PPASS
DetailsTroy Cobbley
Underground rough to cover passed. Piping can be covered
INSP-Sprinkler Rough-in6/4/20156/5/20156/5/2015PFAIL
DetailsJim Page
Underground piping stub in did not match city approved drawings.
INSP-Sprinkler Rough-in6/4/20156/4/20156/4/2015PFAIL
DetailsTroy Cobbley
Called contact three times and left one message. Went to job site and did not find contact. No inspection performed.
Intake Approval  4/15/2015 PASS
Plan assigned to (Tim)4/15/2015 4/15/2015 DONE
DetailsTim Frost
Sprinkler Plan Check4/15/2015 4/15/2015 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  4/15/2015 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  4/15/2015 DONE
DetailsTim Frost
Permit Ready to Issue  4/15/2015 DONE
Issue and Print Permit  4/15/2015 DONE
Inspection Record Card- Fire4/15/2015 4/15/2015 DONE
DetailsBrittany Hill
Application received  4/8/2015 DONE
Application submitted via PDS Online on Apr 8 2015 5:32PM