INSP-Final Inspection | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 5/6/2015 | 5/6/2015 | 5/6/2015 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
Permit Ready to Issue | | | 4/23/2015 | | DONE |
|
|
|
should not have been issued yet
|
CHANGE STATUS TO (ISS) | | | 4/23/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/23/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/23/2015 | | 4/23/2015 | | DONE |
Brittany Hill
|
|
|
|
1st review completed | | | 4/22/2015 | | PASS |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/16/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/16/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/16/2015 | | 4/16/2015 | | DONE |
Brittany Hill
|
|
|
|
Intake Approval | | | 4/10/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 4/10/2015 | | 4/10/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/10/2015 | | 4/10/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 4/10/2015 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 4/9/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 9 2015 1:26PM
|