INSP-Final Inspection | 6/11/2015 | 6/11/2015 | 6/11/2015 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | CANC |
Jim Page
|
|
|
Per telephone call with Jon phone # ###-####, All Valley Fire Protection, not the correct FIR# or job for the inspection that AVFP is requesting,
|
CHANGE STATUS TO (ISS) | | | 6/5/2015 | | DONE |
|
|
|
|
INSP-Final Inspection | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | FAIL |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered
|
Application received | | | 4/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 10 2015 6:58AM
|
Intake Approval | | | 4/10/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 4/10/2015 | | 4/10/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/10/2015 | | 4/10/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/10/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/10/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/10/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/10/2015 | | 4/10/2015 | | DONE |
Kristal Soland
|
|
|
|