Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR15-00235
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 119 S 10TH ST
Project Name119 Condominiums
Customer NumberUDG ONLY
ePlanReviewYes
Description
[10th and Grove Condos] - Quick Permit
This is for the underground portion of the project 6"x22 C-900 with necessary fitting and thrust blocks.. Above ground submittal to be submitted at a future date.

Permit to construct 4 floors Type V One Hour construction over 3 hour horizontal separation of the Type 1A 2 story parking garage per City of Boise Type V ordinance. This portion of the building consists of 26 units of condominium spaces on top of a two story concrete parking podium with 3 hour separation. The podium plans are currently under review as BLD14-02156. This building is required to be fire sprinklered. Separate Fire Alarm and Fire Sprinker permits will be required; as regulated by the Fire Department.**ajs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/26/201610/28/201610/27/2016PPASS
DetailsJim Page
Final underground inspection passed/complete
INSP-Sprinkler Rough-in/Hydro2/18/20162/19/20162/19/2016PPASS
DetailsJim Page
hydrostatic test (200psi for 2 hours) passed/complete for underground fire supply main.
INSP-Supply line flush2/16/20162/16/20162/17/2016PCANC
DetailsJim Page
Inspection request cancelled, assigned to wrong inspector.
INSP-Supply line flush2/16/20162/16/20162/16/2016PDONE
DetailsJim Page
Underground fire main flush complete.
INSP-Supply line flush2/12/20162/16/20162/15/2016ACANC
DetailsJim Page
Suez was contacted to turn the water on at the site on Monday morning. Please contact Matt with questions. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in6/3/20156/4/20156/4/2015PPASS
DetailsJim Page
Underground approved for cover.
INSP-Sprinkler Rough-in6/2/20156/3/20156/3/2015ACANC
DetailsJim Page
This is an underground to cover inspection. Bryan is the contact. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
Intake Approval  4/17/2015 PASS
Plan assigned to (Tim)4/17/2015 4/17/2015 DONE
DetailsTim Frost
Sprinkler Plan Check4/17/2015 4/17/2015 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  4/17/2015 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  4/17/2015 DONE
DetailsTim Frost
Permit Ready to Issue  4/17/2015 DONE
Issue and Print Permit  4/17/2015 DONE
Inspection Record Card- Fire4/17/2015 4/17/2015 DONE
DetailsBrittany Hill
Application received  4/16/2015 DONE
Application submitted via PDS Online on Apr 16 2015 1:17PM