INSP-Final Inspection | 7/8/2015 | 7/9/2015 | 7/9/2015 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 6/15/2015 | 6/15/2015 | 6/16/2015 | P | PASS |
Jim Page
|
|
|
Overhead 24 hour Air Test passed/complete on the dry system covering the south loading dock.
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2015 | 6/11/2015 | 6/11/2015 | P | PASS |
Troy Cobbley
|
|
|
Rough-in and overhead 200lb hydro for the new dock dry pipe system passed
|
Permit Ready to Issue | | | 4/24/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/24/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/24/2015 | | 4/24/2015 | | DONE |
Brittany Hill
|
|
|
|
Sprinkler Plan Check | 4/23/2015 | | 4/23/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/20/2015 | | 4/20/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 4/20/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 4/20/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Miscellaneous action | | | 4/20/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 4/17/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 4/17/2015 | | 4/17/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 4/16/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 16 2015 1:59PM
|