INSP-Final Inspection | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/4/2015 | 10/5/2015 | 10/5/2015 | A | FAIL |
Troy Cobbley
|
|
|
Need correct responding address, need as-builts submitted to Lee, outside electric bell did not function, phone lines for fire alarm control panel need to be installed correctly, need map at the fire alarm control panel. All other items tested ok.
|
Permit Ready to Issue | | | 4/27/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/27/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/27/2015 | | 4/27/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Plan assigned to (Lee) | 4/24/2015 | | 4/24/2015 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/24/2015 | | PASS |
|
|
|
|
Alarm Plan Check | 4/24/2015 | | 4/24/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/24/2015 | | DONE |
|
|
|
Plans approved with review comments. Projectdox updated.
|
Application received | | | 4/23/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 23 2015 4:34PM
|