Permit Information
Permit NumberFIR15-00258
StatusFinaled
Name WEBSTER FIRE PROTECTION
Site Address 350 N 9TH ST Unit: 200
Project NameJefferson Place Suite 200 TI
Customer Number 
ePlanReviewYes
Description
Replace defective FACP and provide notification in Suite 200.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  10/12/2016 DONE
This permit had an approved final acceptance test on 1/13/16. I emailed Rita to let her know that if this is new work, it needs to be submitted under a new permit number.
INSP-Final Inspection1/13/20161/13/20161/13/2016PPASS
DetailsJim Page
Fire panel replaced for building, suite 200 notification passed/complete
INSP-Final Inspection7/13/20157/13/20157/13/2015PPART
DetailsTroy Cobbley
The only approved items/devices tested/checked today are flow switch, pump running, tamper switchs and the Suite 200 audio/visual devices. Per the installation contractor phase reversal is not an option which will need to be approved by plan review.
Inspection Record Card- Fire7/13/2015 7/13/2015 DONE
DetailsBrittany Hill
Issue and Print Permit  7/13/2015 DONE
(F) Reprint permit  7/13/2015 DONE
Plan resubmittals received  7/10/2015 DONE
Resubmittals received. Workflow in eplanreview had locked up so I manually inserted these drawings.
Alarm Plan Check7/10/2015 7/10/2015 PASS
DetailsLee G Meredith
Only drawing PF011 FA 1.1.2 is approved. The balance of the submittal is to be provided under a seperate permit with an upgrade agreement.
PLANS TAKEN FRONT DESK ALARM  7/10/2015 DONE
Plan assigned to (Lee)4/27/2015 4/27/2015 DONE
DetailsLee G Meredith
1st review completed  4/27/2015 FAIL
See 1st plan review comments.
Application received  4/25/2015 DONE
Application submitted via PDS Online on Apr 25 2015 2:40PM