Miscellaneous action | | | 10/12/2016 | | DONE |
|
|
|
This permit had an approved final acceptance test on 1/13/16. I emailed Rita to let her know that if this is new work, it needs to be submitted under a new permit number.
|
INSP-Final Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Jim Page
|
|
|
Fire panel replaced for building, suite 200 notification passed/complete
|
INSP-Final Inspection | 7/13/2015 | 7/13/2015 | 7/13/2015 | P | PART |
Troy Cobbley
|
|
|
The only approved items/devices tested/checked today are flow switch, pump running, tamper switchs and the Suite 200 audio/visual devices. Per the installation contractor phase reversal is not an option which will need to be approved by plan review.
|
Inspection Record Card- Fire | 7/13/2015 | | 7/13/2015 | | DONE |
Brittany Hill
|
|
|
|
Issue and Print Permit | | | 7/13/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/13/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/10/2015 | | DONE |
|
|
|
Resubmittals received. Workflow in eplanreview had locked up so I manually inserted these drawings.
|
Alarm Plan Check | 7/10/2015 | | 7/10/2015 | | PASS |
Lee G Meredith
|
|
|
Only drawing PF011 FA 1.1.2 is approved. The balance of the submittal is to be provided under a seperate permit with an upgrade agreement.
|
PLANS TAKEN FRONT DESK ALARM | | | 7/10/2015 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 4/27/2015 | | 4/27/2015 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/27/2015 | | FAIL |
|
|
|
See 1st plan review comments.
|
Application received | | | 4/25/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 25 2015 2:40PM
|