Case Summary | | | 12/8/2015 | | DONE |
|
|
|
|
INSP-Final Inspection | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 6/3/2015 | 6/4/2015 | 6/4/2015 | P | CANC |
Troy Cobbley
|
|
|
This permit is for a fire alarm system. Contractor needed a sprinkler system rough-in inspection. Correct permit number will need to be scheduled.
|
INSP-Supply line flush | 5/26/2015 | 5/27/2015 | 5/27/2015 | A | PASS |
Troy Cobbley
|
|
|
Supply line flush passed.
|
Permit Ready to Issue | | | 5/4/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/4/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/4/2015 | | 5/4/2015 | | DONE |
Kristal Soland
|
|
|
|
Plan assigned to (Lee) | 4/30/2015 | | 4/30/2015 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/30/2015 | | PASS |
|
|
|
|
Alarm Plan Check | 4/30/2015 | | 4/30/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/30/2015 | | DONE |
|
|
|
Planns approved with review comments. Projectdox updated.
|
Application received | | | 4/28/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 28 2015 1:31PM
|