INSP-Final Inspection | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/14/2015 | 7/14/2015 | 7/14/2015 | P | FAIL |
Troy Cobbley
|
|
|
Painted head and the outside alarm bell did not function on the second flow switch
|
INSP-Supply line flush | 6/4/2015 | 6/5/2015 | 6/5/2015 | A | PASS |
Jim Page
|
|
|
Underground supply line flush complete
|
INSP-Sprinkler Rough-in/Hydro | 5/26/2015 | 5/27/2015 | 5/27/2015 | A | PASS |
Jim Page
|
|
|
Hydrostatic test for 1st floor, 2nd floor and FDC passed.
|
INSP-Sprinkler Rough-in | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | PASS |
Jim Page
|
|
|
Overhead piping/tenting approved for cover.
|
Inspection Record Card- Fire | 5/14/2015 | | 5/14/2015 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 5/14/2015 | | DONE |
|
|
|
|
Intake Approval | | | 5/5/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/5/2015 | | 5/5/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/5/2015 | | 5/5/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/5/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/5/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/5/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/5/2015 | | 5/5/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 4/29/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 29 2015 6:39PM
|