INSP-Final Inspection | 7/14/2015 | 7/14/2015 | 7/14/2015 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Supply line flush | 6/4/2015 | 6/5/2015 | 6/5/2015 | A | PASS |
Jim Page
|
|
|
Underground supply line flush complete
|
INSP-Sprinkler Rough-in/Hydro | 5/26/2015 | 5/27/2015 | 5/27/2015 | A | PASS |
Jim Page
|
|
|
Hydrostatic test for 1st floor, 2nd floor and FDC passed
|
INSP-Sprinkler Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 | A | PASS |
Jim Page
|
|
|
Rough in complete for cover
|
INSP-Sprinkler Rough-in | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | PART |
Jim Page
|
|
|
Overhead piping/tenting approved for cover, riser mounted to far from wall
|
INSP-Sprinkler Rough-in/Hydro | 5/21/2015 | 5/22/2015 | 5/22/2015 | P | CANC |
Troy Cobbley
|
|
|
Mike Meier will not be ready. To be rescheduled for next week
|
INSP-Sprinkler Rough-in/Hydro | 5/21/2015 | 5/22/2015 | 5/21/2015 | A | CANC |
Troy Cobbley
|
|
|
Mike Meier is the contact. Thanks! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
Intake Approval | | | 5/13/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/13/2015 | | 5/13/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/13/2015 | | 5/13/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/13/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/13/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/13/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/13/2015 | | 5/13/2015 | | DONE |
Kristal Soland
|
|
|
|
Application received | | | 5/9/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 9 2015 4:29PM
|