INSP-Final Inspection | 8/4/2015 | 8/5/2015 | 8/5/2015 | A | PASS |
Jim Page
|
|
|
Fire sprinkler final inspection passed/complete. Tenting was inspected and passed on June 5th, 2015 but inputed under the underground FIR15-00309 number.
|
INSP-Final Inspection | 8/5/2015 | 8/5/2015 | 8/5/2015 | P | CANC |
Jim Page
|
|
|
This is a final for the underground. Colton is onsite. Please schedule with him. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 6/10/2015 | 6/10/2015 | 6/10/2015 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed
|
INSP-Supply line flush | 6/9/2015 | 6/10/2015 | 6/10/2015 | P | PASS |
Troy Cobbley
|
|
|
The underground flush passed
|
INSP-Supply line flush | 6/9/2015 | 6/9/2015 | 6/9/2015 | P | CANC |
Troy Cobbley
|
|
|
This is an underground flush request. Colton is the contact. Thanks! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 6/3/2015 | 6/4/2015 | 6/4/2015 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Colt Phone #: ###-####
|
Intake Approval | | | 5/13/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/13/2015 | | 5/13/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/13/2015 | | 5/13/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/13/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/13/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/13/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/13/2015 | | 5/13/2015 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 5/9/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 9 2015 4:32PM
|