INSP-Final Inspection | 9/24/2015 | 9/25/2015 | 9/25/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/23/2015 | 9/24/2015 | 9/24/2015 | A | FAIL |
Troy Cobbley
|
|
|
Left message on contacts phone that I was on the way. Fire alarm contractor and I waited for a bit. No inspection performed.
|
INSP-Sprinkler Rough-in/Hydro | 9/24/2015 | 9/25/2015 | 9/24/2015 | A | CANC |
Troy Cobbley
|
|
|
Colton is the contact. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 7/29/2015 | 7/30/2015 | 7/30/2015 | A | PASS |
Troy Cobbley
|
|
|
The overhead rough to cover and tenting inspection passed. Piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 7/10/2015 | 7/13/2015 | 7/13/2015 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro passed
|
INSP-Final Inspection | 7/8/2015 | 7/9/2015 | 7/9/2015 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was actually for an underground supply line flush which passed.
|
Permit Ready to Issue | | | 5/14/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 5/14/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/14/2015 | | 5/14/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Intake Approval | | | 5/13/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/13/2015 | | 5/13/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/13/2015 | | 5/13/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/13/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 5/9/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 9 2015 4:40PM
|