INSP-Final Inspection | 9/21/2015 | 9/22/2015 | 9/22/2015 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete per Troy Cobbley
|
Sprinkler Plan Check | 9/21/2015 | | 9/21/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2015 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/21/2015 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 9/9/2015 | | 9/9/2015 | | DONE |
Tim Frost
|
|
|
|
INSP-Final Inspection | 9/1/2015 | 9/2/2015 | 9/2/2015 | A | FAIL |
Troy Cobbley
|
|
|
Provide listed air maintenance device, provide pipe size changes in the "dog houses".
|
INSP-Alarm Testing | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
INSP-Alarm Testing | 7/13/2015 | 7/14/2015 | 7/14/2015 | P | PASS |
Troy Cobbley
|
|
|
24 hr air test Boise Spectrum - Bldg C passed
|
INSP-Alarm Testing | 7/13/2015 | 7/13/2015 | 7/14/2015 | P | PASS |
Troy Cobbley
|
|
|
24 hr air test Boise Spectrum - Bldg C started with guage pressure marked.
|
INSP-Sprinkler Rough-in/Hydro | 7/8/2015 | 7/10/2015 | 7/10/2015 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
Sprinkler Plan Check | 6/9/2015 | | 6/9/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2015 | | DONE |
Tim Frost
|
|
|
|
(F) Reprint permit | | | 6/9/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/9/2015 | | 6/9/2015 | | DONE |
Brittany Hill
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/9/2015 | | DONE |
|
|
|
Plan Mod
|
CHANGE STATUS TO (ISS) | | | 6/9/2015 | | DONE |
|
|
|
|
Intake Approval | | | 5/18/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/18/2015 | | 5/18/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/18/2015 | | 5/18/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/18/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/18/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 5/18/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/18/2015 | | 5/18/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Application received | | | 5/12/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 12 2015 12:28PM
|