INSP-Final Inspection | 9/21/2015 | 9/22/2015 | 9/22/2015 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete per Troy Cobbley
|
INSP-Final Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 | P | CANC |
Troy Cobbley
|
|
|
Please call 30 min prior to arrival.
Thank you, Phone #: ###-#### >> Inspection requested via web by Scott Carter II Inspection cancelled from web by: Scott Carter II
|
INSP-Final Inspection | 9/1/2015 | 9/2/2015 | 9/2/2015 | A | FAIL |
Troy Cobbley
|
|
|
The air maintenance device does not appear to be listed. Replace or provide verification.
|
INSP-Alarm Testing | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | PASS |
Troy Cobbley
|
|
|
24 hr air test Boise Spectrum - Bldg B passed
|
INSP-Alarm Testing | 7/13/2015 | 7/14/2015 | 7/14/2015 | P | PART |
Troy Cobbley
|
|
|
24 hr air test Boise Spectrum - Bldg B started at 9:00am with pressure marked on guage
|
INSP-Alarm Testing | 7/13/2015 | 7/13/2015 | 7/14/2015 | P | FAIL |
Troy Cobbley
|
|
|
24 hr air test Boise Spectrum - Bldg B failed. Door was locked to riser room
|
INSP-Sprinkler Rough-in/Hydro | 7/8/2015 | 7/10/2015 | 7/10/2015 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
Sprinkler Plan Check | 6/16/2015 | | 6/16/2015 | | FAIL |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/16/2015 | | 6/16/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/16/2015 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/5/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/5/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/5/2015 | | 6/5/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/4/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/4/2015 | | 6/4/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/4/2015 | | 6/4/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/4/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2015 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 5/18/2015 | | FAIL |
|
|
|
I asked for a revised riser detail.
|
Application received | | | 5/14/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 14 2015 3:37PM
|