INSP-Final Inspection | 10/29/2015 | 10/30/2015 | 10/30/2015 | A | PASS |
Jim Page
|
|
|
Final underground inspection passed/complete
|
INSP-Supply line flush | 9/16/2015 | 9/17/2015 | 9/17/2015 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Supply line flush | 9/4/2015 | 9/8/2015 | 9/8/2015 | P | PART |
Troy Cobbley
|
|
|
Underground flush failed due to no water. Underground hydro passed.
|
INSP-Sprinkler Rough-in | 7/27/2015 | 7/28/2015 | 7/28/2015 | A | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok to cover.
|
INSP-Sprinkler Rough-in | 5/19/2015 | 5/19/2015 | 5/19/2015 | P | CANC |
Troy Cobbley
|
|
|
This is an underground to cover inspection with concrete scheduled to arrive at 1pm. Bryan is the contact. Thanks! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
Intake Approval | | | 5/18/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/18/2015 | | 5/18/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/18/2015 | | 5/18/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/18/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/18/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 5/18/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/18/2015 | | 5/18/2015 | | DONE |
Kristal Soland
|
|
|
|
Application received | | | 5/15/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 15 2015 10:54AM
|