INSP-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 6/23/2015 | 6/23/2015 | 6/23/2015 | P | PASS |
Troy Cobbley
|
|
|
Rough to cover and overhead hydro passed inspection. Piping is ok to cover.
|
INSP-Supply line flush | 6/18/2015 | 6/18/2015 | 6/18/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
Intake Approval | | | 6/17/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/17/2015 | | 6/17/2015 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/17/2015 | | 6/17/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
CHANGE STATUS TO (ISS) | | | 6/17/2015 | | DONE |
|
|
|
No additonal fees due per Tim Frost
|
INSP-Sprinkler Rough-in | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | PASS |
Jim Page
|
|
|
Underground approved for cover
|
Intake Approval | | | 5/26/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/26/2015 | | 5/26/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/26/2015 | | 5/26/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/26/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/26/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/26/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 5/26/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/26/2015 | | 5/26/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Application received | | | 5/20/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 20 2015 4:45PM
|