Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR15-00360
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1472 N FRY LN
Project Name#1472 Aberdeen 4-Plex Phase 4
Customer Number 
ePlanReviewYes
Description
[Aberdeen 4-Plex Phase 4 #1472 - Building #1]
CPVC piping is being used with extended coverage residential sprinklers to protect a two level, four unit apartment building using NFPA 13R

The underground is under permit FIR15-00349

L11B1 - 1472 Fry (Bldg 1): To construct a new 3,842 sq. ft., two story, Four unit, apartment building. Each unit has two bedrooms and two bathrooms. The 1st story units are 959 square feet and are required to be Type 'B' units. The 2nd story units are 962 square feet. All units share a common path of egress into and through a 1/2-hour rated exit corridor with 20 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partitions and one hour horizontal assemblies are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00276 & CUP13-00017 Per Planning and Zoning. **SRZ*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/19/20158/20/20158/20/2015APASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush6/17/20156/18/20156/18/2015ACANC
DetailsTroy Cobbley
Wrong permit scheduled
INSP-Supply line flush6/10/20156/11/20156/11/2015PFAIL
DetailsJim Page
Service not turned on to the building
INSP-Supply line flush6/10/20156/10/20156/10/2015PCANC
DetailsTroy Cobbley
This is a flush request. Colton is the contact. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
Intake Approval  5/27/2015 PASS
Plan assigned to (Tim)5/27/2015 5/27/2015 DONE
DetailsTim Frost
Sprinkler Plan Check5/27/2015 5/27/2015 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  5/27/2015 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  5/27/2015 DONE
DetailsTim Frost
Permit Ready to Issue  5/27/2015 DONE
all requirments met
Issue and Print Permit  5/27/2015 DONE
Inspection Record Card- Fire5/27/2015 5/27/2015 DONE
DetailsCarlos Velazquez
Application received  5/23/2015 DONE
Application submitted via PDS Online on May 23 2015 9:45AM