INSP-Final Inspection | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | CANC |
Troy Cobbley
|
|
|
Please meet in the B.25 plan review room. Phone #: ###-#### Inspection requested via web by John Wheeler
|
INSP-Sprinkler Rough-in/Hydro | 11/30/2015 | 12/1/2015 | 12/1/2015 | A | PASS |
Jim Page
|
|
|
200 psi hydrostatic test for overhead fire sprinkler piping passed/complete.
|
Plan assigned to (Tim) | 10/6/2015 | | 10/13/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/13/2015 | | 10/13/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/13/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/13/2015 | | DONE |
|
|
|
requirements met
|
Telephone call | | | 10/13/2015 | | DONE |
|
|
|
called Paul to let know permit is ready-left message on his phone
|
Issue and Print Permit | | | 10/13/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/13/2015 | | 10/13/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Plan assigned to (Scott) | | | 6/11/2015 | | DONE |
Bill Alexander
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 6/11/2015 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|