INSP-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | FAIL |
Troy Cobbley
|
|
|
Made two trips. Ceiling tile still has not been installed.
|
INSP-Sprinkler Rough-in | 8/4/2015 | 8/5/2015 | 8/5/2015 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection passed/complete, approved for cover
|
Permit Ready to Issue | | | 7/6/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/6/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/6/2015 | | 7/6/2015 | | DONE |
Kristal Soland
|
|
|
|
Application received | | | 6/19/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 19 2015 1:39PM
|
Intake Approval | | | 6/19/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/19/2015 | | 6/19/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/19/2015 | | 6/19/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/19/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2015 | | DONE |
Tim Frost
|
|
|
|