INSP-Final Inspection | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete for core and shell
|
(F) Reprint permit | | | 7/11/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/11/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 7/8/2016 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/8/2016 | | 7/8/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/8/2016 | | 7/8/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/8/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/7/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 8/7/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/7/2015 | | 8/7/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Sprinkler Plan Check | 8/6/2015 | | 8/6/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/2/2015 | | 7/2/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/2/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/2/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 6/30/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/30/2015 | | 6/30/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 6/24/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 24 2015 7:29AM
|