INSP-Final Inspection | 12/7/2015 | 12/9/2015 | 12/9/2015 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete.
|
Miscellaneous action | | | 12/2/2015 | | DONE |
|
|
|
Charlie Bayne emailed to indicate the building doesn't have visual notification and asked why I required on in the remodeled xray room. I told him visual notification was shown on the drawing in existing rooms and the device legend. I told him that if the building does not have visual notification that he could maintain the existing horn only system.
|
Permit Ready to Issue | | | 6/30/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/30/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/30/2015 | | 6/30/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 6/29/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 29 2015 11:39AM
|
Plan assigned to (Lee) | 6/29/2015 | | 6/29/2015 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 6/29/2015 | | PASS |
|
|
|
|
Alarm Plan Check | 6/29/2015 | | 6/29/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/29/2015 | | DONE |
|
|
|
Plans approved with review comments and requirements. Projectedox update.
|