INSP-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 8/3/2015 | 8/3/2015 | 8/3/2015 | P | PASS |
Jim Page
|
|
|
Rough to cover for entire project complete, approved for cover.
|
INSP-Conference | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | CANC |
Jim Page
|
|
|
Zack-GC, phone number ###-####, called in a conference for BLD15-01729, the tenant space , not the FIR permit.
|
INSP-Sprinkler Rough-in/Hydro | 7/21/2015 | 7/22/2015 | 7/22/2015 | A | PART |
Jim Page
|
|
|
Notated area's approved for cover with red ink on the city approved drawings.
|
Intake Approval | | | 7/6/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 7/6/2015 | | 7/6/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/6/2015 | | 7/6/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/6/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/6/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/6/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/6/2015 | | 7/6/2015 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 7/1/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 1 2015 3:58PM
|