INSP-Final Inspection | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 8/3/2016 | 8/4/2016 | 8/4/2016 | A | PASS |
Troy Cobbley
|
|
|
The underground re-hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 8/1/2016 | 8/2/2016 | 8/2/2016 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit number called in. Overhead pemit should have been used.
|
INSP-Sprinkler Rough-in | 3/31/2016 | 4/4/2016 | 4/4/2016 | A | CANC |
Troy Cobbley
|
|
|
requesting an inspection at the Holiday Inn Express on the 4th Floor Type of inspection -Rough to cover. The contact is Robert Mullins - ###-####. Phone #: ###-#### >> Inspection requested via web by Kay Haney Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | CANC |
Troy Cobbley
|
|
|
Wrong permit called in for inspection
|
INSP-Sprinkler Rough-in/Hydro | 12/2/2015 | 12/3/2015 | 12/3/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed
|
INSP-Sprinkler Rough-in | 8/31/2015 | 8/31/2015 | 8/31/2015 | P | PASS |
Troy Cobbley
|
|
|
The underground rough to cover passed.
|
INSP-Sprinkler Rough-in | 8/24/2015 | 8/25/2015 | 8/25/2015 | P | CANC |
Troy Cobbley
|
|
|
Bryan is the contact. Concrete is coming at 12pm. Please contact Bryan for scheduling. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
Permit Ready to Issue | | | 7/7/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/7/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/7/2015 | | 7/7/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Intake Approval | | | 7/6/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 7/6/2015 | | 7/6/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/6/2015 | | 7/6/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/6/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/2/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 2 2015 2:22PM
|