INSP-Final Inspection | 9/3/2015 | 9/4/2015 | 9/4/2015 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 9/2/2015 | 9/3/2015 | 9/3/2015 | A | CANC |
Jim Page
|
|
|
Called Sam, at phone # ###-####, inspection will be rescheduled to coincide with alarm inspection and life fire safety inspection.
|
INSP-Sprinkler Rough-in | 7/14/2015 | 7/14/2015 | 7/14/2015 | P | PASS |
Jim Page
|
|
|
Rough-in inspection passed/complete, approved for cover
|
Intake Approval | | | 7/6/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 7/6/2015 | | 7/6/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/6/2015 | | 7/6/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/6/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/6/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 7/6/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/6/2015 | | 7/6/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Application received | | | 7/3/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 3 2015 2:22PM
|