INSP-Final Inspection | 11/6/2015 | 11/13/2015 | 11/13/2015 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection on dry system conversion passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 8/27/2015 | 8/28/2015 | 8/28/2015 | A | PASS |
Jim Page
|
|
|
24 hour air test passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 8/26/2015 | 8/27/2015 | 8/27/2015 | A | PART |
Jim Page
|
|
|
Hydrostatic test passed/complete on dry system. 24 hour air test started at 1140, 43psi at test start time.
|
Permit Ready to Issue | | | 7/30/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/30/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/30/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/30/2015 | | 7/30/2015 | | DONE |
Brittany Hill
|
|
|
|
Intake Approval | | | 7/22/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 7/22/2015 | | 7/22/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/22/2015 | | 7/22/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/22/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/14/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 14 2015 11:42AM
|