INSP-Final Inspection | 3/4/2016 | 3/4/2016 | 3/4/2016 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in | 2/11/2016 | 2/12/2016 | 2/12/2016 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test passed
|
INSP-Sprinkler Rough-in | 2/11/2016 | 2/11/2016 | 2/11/2016 | P | PART |
Troy Cobbley
|
|
|
24 hour air test for dry system started at 10:00 with 43psi on guage.
|
INSP-Sprinkler Rough-in/Hydro | 8/27/2015 | 8/28/2015 | 8/28/2015 | A | PASS |
Troy Cobbley
|
|
|
Underground flush and hydro passed
|
Telephone call | | | 8/19/2015 | | PASS |
|
|
|
The existing underground connection was 4" in lieu of 6". The designer performed hydraulic calculations to verify the change did not have a detrimental affect on the system.
|
INSP-Sprinkler Rough-in | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | PASS |
Jim Page
|
|
|
Inspected rest of piping requested for cover, underground approved for cover
|
INSP-Sprinkler Rough-in | 8/13/2015 | 8/13/2015 | 8/13/2015 | P | PART |
Troy Cobbley
|
|
|
Inspection was a cover for the underground supply. Not all of the underground was installled so see the city approved plans for exact location where piping is ok to cover.
|
Permit Ready to Issue | | | 8/12/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 8/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/12/2015 | | 8/12/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Intake Approval | | | 7/30/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 7/30/2015 | | 7/30/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/30/2015 | | 7/30/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/30/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/28/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 28 2015 3:13PM
|