Case Summary | | | 6/6/2016 | | DONE |
|
|
|
|
INSP-Final Inspection | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete
|
INSP-Alarm Testing | 1/6/2016 | 1/12/2016 | 1/12/2016 | A | DONE |
Jim Page
|
|
|
Alarm testing complete.
|
Plan resubmittals received | | | 8/7/2015 | | DONE |
|
|
|
|
Alarm Plan Check | 8/7/2015 | | 8/7/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/7/2015 | | DONE |
|
|
|
Plans approved with requirements. Minor corrections are to be made (as noted on the drawings) prior to final acceptance on as built drawings.
|
Permit Ready to Issue | | | 8/7/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/7/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/7/2015 | | 8/7/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Plan resubmittals received | | | 8/6/2015 | | DONE |
|
|
|
|
Telephone call | | | 8/6/2015 | | |
|
|
|
Called Ken to discuss design deficiencies that still exist on the 3rd submittal of this project. The balance of deficiences are individually shown on the 3rd failed review comments.
|
Alarm Plan Check | 8/6/2015 | | 8/6/2015 | | FAIL |
Lee G Meredith
|
|
|
See 3rd review comments.
|
Plan resubmittals received | | | 8/5/2015 | | DONE |
|
|
|
|
Alarm Plan Check | 8/5/2015 | | 8/5/2015 | | FAIL |
Lee G Meredith
|
|
|
Most items previously noted as deficiencies have not been addressed. See 2nd review comments.
|
Miscellaneous action | | | 8/5/2015 | | DONE |
|
|
|
2nd review comments emailed to Ken Webster.
|
Plan assigned to (Lee) | 7/31/2015 | | 7/31/2015 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 7/31/2015 | | FAIL |
|
|
|
See 1st review comments.
|
Application received | | | 7/28/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 28 2015 3:14PM
|