INSP-Final Inspection | 10/26/2016 | 10/27/2016 | 10/27/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed.
|
INSP-Supply line flush | 10/20/2015 | 10/21/2015 | 10/21/2015 | P | CANC |
Troy Cobbley
|
|
|
would like call ahead; Ron Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/20/2015 | 10/21/2015 | 10/21/2015 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line is approved for cover. I received a letter from the engineer stating that there is adequate cover for the fire line. Letter was forwarded to Tim Frost for attachment to case.
|
INSP-Final Inspection | 8/11/2015 | 8/13/2015 | 8/13/2015 | P | FAIL |
Troy Cobbley
|
|
|
Alarm; John
No contact phone number was given, I went to the job site and no one was there. No one in the U Haul office knew anything. Permit is for underground sprinkler. No inspection performed.
|
Issue and Print Permit | | | 8/4/2015 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/31/2015 | | 8/3/2015 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 8/3/2015 | | DONE |
|
|
|
received four copies of Fire Sprinkler Permit Plan Review packet and four copies of application packet- put in fire cubby
|
Sprinkler Plan Check | 8/3/2015 | | 8/3/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2015 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 8/3/2015 | | 8/3/2015 | | DONE |
Brittany Hill
|
|
|
|
Telephone call | | | 8/3/2015 | | DONE |
|
|
|
Spoke with Ron informing him that the permit is ready and the fee amount that is due
|
Permit Ready to Issue | | | 8/3/2015 | | DONE |
|
|
|
ALL REQUIREMENTS MET
|
Intake Approval | | | 7/31/2015 | | PASS |
|
|
|
|
Sprinkler Plan Check | 7/31/2015 | | 7/31/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/31/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/31/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 7/31/2015 | | |
|
|
|
|