Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR15-00522
StatusFinaled
Name LARSON FIRE PROTECTION LLC
Site Address 1121 N ORCHARD ST
Project NameU-Haul of Orchard Stree
Customer NumberUDG ONLY
ePlanReviewNo
Description
[U-Haul]
The fire sprinkler scope of work consists of new 6”x157’± C-900 underground piping with necessary fittings and thrust blocks,

(U-HAUL CLIMATE CONTROL STORAGE BUILDING) Permit to construct a new 37,616 square foot two story climate controlled storage building and related site improvements. Approval contingent upon adhering to the approved plans on file, Planning Approvals and engineering. Work to include: construction of new foundation, new accessible parking, new accessible route, [construction of a tilt up concrete first floor, steel pan deck, and metal building second floor and roof structure], new electrical, new mechanical, new plumbing, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building will be fully Fire Sprinklered with an approved Fire Alarm system per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/26/201610/27/201610/27/2016APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro10/21/201510/22/201510/22/2015APASS
DetailsTroy Cobbley
Underground hydro test passed.
INSP-Supply line flush10/20/201510/21/201510/21/2015PCANC
DetailsTroy Cobbley
would like call ahead; Ron Phone #: ###-####
INSP-Sprinkler Rough-in10/20/201510/21/201510/21/2015APASS
DetailsTroy Cobbley
Underground supply line is approved for cover. I received a letter from the engineer stating that there is adequate cover for the fire line. Letter was forwarded to Tim Frost for attachment to case.
INSP-Final Inspection8/11/20158/13/20158/13/2015PFAIL
DetailsTroy Cobbley
Alarm; John

No contact phone number was given, I went to the job site and no one was there. No one in the U Haul office knew anything. Permit is for underground sprinkler. No inspection performed.
Issue and Print Permit  8/4/2015 DONE
Plan assigned to (Tim)7/31/2015 8/3/2015 DONE
DetailsTim Frost
Plan resubmittals received  8/3/2015 DONE
received four copies of Fire Sprinkler Permit Plan Review packet and four copies of application packet- put in fire cubby
Sprinkler Plan Check8/3/2015 8/3/2015 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  8/3/2015 DONE
DetailsTim Frost
Inspection Record Card- Fire8/3/2015 8/3/2015 DONE
DetailsBrittany Hill
Telephone call  8/3/2015 DONE
Spoke with Ron informing him that the permit is ready and the fee amount that is due
Permit Ready to Issue  8/3/2015 DONE
ALL REQUIREMENTS MET
Intake Approval  7/31/2015 PASS
Sprinkler Plan Check7/31/2015 7/31/2015 FAIL
DetailsTim Frost
1st review completed  7/31/2015 FAIL
DetailsTim Frost
Miscellaneous action  7/31/2015 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  7/31/2015