INSP-Final Inspection | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 10/9/2015 | 10/12/2015 | 10/12/2015 | A | PART |
Troy Cobbley
|
|
|
Rough-in passed but piping can not be covered until the insulation along the walls has been re-attached to the roof deck and I verify that.
|
Intake Approval | | | 8/4/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/4/2015 | | 8/4/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/4/2015 | | 8/4/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/4/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2015 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 8/4/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/4/2015 | | 8/4/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Application received | | | 8/3/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 3 2015 6:19PM
|