Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR15-00537
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 880 N MAPLE GROVE RD
Project NameAshville Commons 4-Plex #880
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Bldg C (3) - Type 1 (Elev 4, A-203) - Udg Only] - Quick Permit
This is for the dedicated 2" poly underground fire line only. The full fire sprinkler submittal will be submitted at a later date.

Bldg C (3) - Type 1 (Elev 4, A-203) Type 'A' accessible units on 1st story: To construct a new 3,804 sq. ft., two story, Four unit, apartment building. Each unit has two bedrooms, two bathrooms, and 951 square feet. The 1st story units are required to be Type 'A' units. All units share a common path of egress into and through a 1/2-hour rated exit corridor with 20 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partitions and one hour horizontal assemblies are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00300 & PUD12-00012 Per Planning and Zoning. **SRZ*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/23/201511/24/201511/24/2015PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in8/18/20158/19/20158/19/2015APASS
DetailsTroy Cobbley
Underground supply piping is ok to cover. I noted that some of the pipe runs are short in distance and United Water supplied stub-in is only at 36" below finish grade.
INSP-Sprinkler Rough-in/Hydro8/17/20158/18/20158/18/2015ACANC
DetailsTroy Cobbley
Not ready per Pat
Permit Ready to Issue  8/7/2015 DONE
all requirments met
Issue and Print Permit  8/7/2015 DONE
Inspection Record Card- Fire8/7/2015 8/7/2015 DONE
DetailsCarlos Velazquez
Intake Approval  8/6/2015 PASS
Plan assigned to (Tim)8/6/2015 8/6/2015 DONE
DetailsTim Frost
Sprinkler Plan Check8/6/2015 8/6/2015 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  8/6/2015 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/6/2015 DONE
DetailsTim Frost
Application received  8/5/2015 DONE
Application submitted via PDS Online on Aug 5 2015 9:05AM