Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR15-00544
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 139 S BROADWAY AVE
Project NameBROADWAY SHOPS
Customer NumberUDG ONLY
ePlanReviewYes
Description
[139 BROADWAY – Shell and Core – South Bldg - Udg Only] - Quick Permit
THIS IS AN UNDERGROUND ONLY PERMIT AT THIS TIME. COMPLETE FIRE SPRINKLER PLANS WILL BE SUBMIITTED SHORTLY FOR THIS EXISTING BUILDING.

(139 BROADWAY – Shell and Core – South Bldg) Permit is to remodel an existing 6,249 square foot building. Remodel consists of a complete exterior façade remodel including new soffits and storefront. Scope of work includes: interior demolition, new mechanical, new plumbing, new electrical, installation of a new sprinkler system, exterior soffits, new storefronts, remodel one restroom to become fully accessible (the other restrooms will be remodeled with tenant improvements), and interior finishes. At the competition of this project the building will be Fully Fire Sprinklered. NOTE: Separate Building Permits are required prior to occupying this space. No tenant improvement permits will be issued until non-build agreement is recorded and approved by the City of Boise Legal Dept. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/28/201510/28/201510/28/2015PPASS
DetailsJim Page
Final underground fire sprinkler supply inspection passed/complete
INSP-Supply line flush10/26/201510/28/201510/28/2015ADONE
DetailsJim Page
Main underground supply line flush complete.
INSP-Sprinkler Rough-in/Hydro9/28/20159/29/20159/29/2015APASS
DetailsJim Page
Underground hydrostatic test pased/complete
INSP-Sprinkler Rough-in9/4/20159/4/20159/4/2015PPASS
DetailsJim Page
Underground inspection passed/complete, approved for cover
INSP-Sprinkler Rough-in8/31/20158/31/20158/31/2015PPART
DetailsJim Page
Partial cover for fire main installed, the rest of the underground fire main will be installed at later date.
Intake Approval  8/11/2015 PASS
Plan assigned to (Tim)8/11/2015 8/11/2015 DONE
DetailsTim Frost
Sprinkler Plan Check8/11/2015 8/11/2015 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  8/11/2015 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/11/2015 DONE
DetailsTim Frost
Permit Ready to Issue  8/11/2015 DONE
Issue and Print Permit  8/11/2015 DONE
Inspection Record Card- Fire8/11/2015 8/11/2015 DONE
DetailsCandy A. Nichols
Application received  8/7/2015 DONE
Application submitted via PDS Online on Aug 7 2015 10:03AM