INSP-Supply line flush | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Supply line flush | 10/30/2015 | 10/30/2015 | 10/30/2015 | P | CANC |
Jim Page
|
|
|
Service providing water to fire riser not turned on, could not flush, contractor will reshedule main line flush when service is turned on.
|
INSP-Sprinkler Rough-in | 10/30/2015 | 10/30/2015 | 10/30/2015 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting passed/complete, approved for cover.
|
INSP-Supply line flush | 10/29/2015 | 10/30/2015 | 10/30/2015 | A | CANC |
Jim Page
|
|
|
Colton is the contact. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 8/31/2015 | 8/31/2015 | 8/31/2015 | P | PASS |
Troy Cobbley
|
|
|
underground supply piping is ok to cover
|
Inspection Record Card- Fire | 8/31/2015 | | 8/31/2015 | | DONE |
Carlos Velazquez
|
|
|
|
(F) Reprint permit | | | 8/31/2015 | | DONE |
|
|
|
|
Intake Approval | | | 8/11/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/11/2015 | | 8/11/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/11/2015 | | 8/11/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/11/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/11/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/11/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/11/2015 | | 8/11/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 8/7/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 7 2015 3:38PM
|