INSP-Final Inspection | 9/30/2016 | 10/3/2016 | 10/3/2016 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete.
|
INSP-Final Inspection | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PART |
Jim Page
|
|
|
Partial final complete for alarm system. Audio visual devices and photo smoke detectors tested on every floor, AHU shutdown tested for rooftop untis. Tamper switches needed to be added to the fire pump isolation valve as well as backflow, tamoers were installed at time of inspection but will ned to be wired up. Wood beam in ballroom was blocking flash from the ceiling mounted strobe, two additional strobes will be mounted and tested during next inspection.
|
Alarm Plan Check | 8/19/2015 | | 8/19/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/19/2015 | | DONE |
|
|
|
Plans approved with review coments.
|
Permit Ready to Issue | | | 8/19/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 8/19/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/19/2015 | | 8/19/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Plan assigned to (Lee) | 8/18/2015 | | 8/18/2015 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/18/2015 | | FAIL |
|
|
|
See review comments.
|
Miscellaneous action | | | 8/18/2015 | | DONE |
|
|
|
Emailed 1st review comments to Rob Ahten.
|
Plan resubmittals received | | | 8/18/2015 | | DONE |
|
|
|
|
Application received | | | 8/17/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 17 2015 12:08PM
|