INSP-Final Inspection | 9/22/2015 | 9/22/2015 | 9/22/2015 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
Intake Approval | | | 9/22/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 9/22/2015 | | 9/22/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/22/2015 | | 9/22/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2015 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/22/2015 | | DONE |
|
|
|
no fees due as per Tim Frost
|
INSP-Final Inspection | 9/15/2015 | 9/16/2015 | 9/16/2015 | A | PASS |
Thomas Walsh
|
|
|
Final inspection of fire sprinkler TI - replacement of existing sprinklers only, from K 5.0 to K4.2. No new heads required. Revised plans will be submitted to show changes from permit set.
|
Permit Ready to Issue | | | 8/24/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/24/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/24/2015 | | 8/24/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/21/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/21/2015 | | 8/21/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/21/2015 | | 8/21/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/21/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/17/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 17 2015 4:15PM
|