INSP-Final Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 | P | PASS |
Jim Page
|
|
|
All previously noted items repaired. Final fire sprinkler inspection passed/complete.
|
INSP-Final Inspection | 12/8/2015 | 12/9/2015 | 12/9/2015 | P | CANC |
Jim Page
|
|
|
Contractor not ready for final inspection, previously noted items on last inspection still need to be addressed. Inspection cancelled per conversation with point of contact, Perly phone number ###-####, will reschedule for later date.
|
INSP-Final Inspection | 12/7/2015 | 12/8/2015 | 12/8/2015 | A | FAIL |
Jim Page
|
|
|
No fire sprinkler head under overhead door, east side of tenant space. Overspacing of upright heads by new stairs install for main entry. Spacing issue with upright head by riser.
|
INSP-Sprinkler Rough-in/Hydro | 11/30/2015 | 11/30/2015 | 11/30/2015 | P | PASS |
Jim Page
|
|
|
200 psi hydrostatic test for underground passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2015 | 11/20/2015 | 11/20/2015 | P | FAIL |
Jim Page
|
|
|
200 psi hydrostatic test performed on the underground supply, underground lost @16psi during the 2 hour hydrostatic test. Underground will have to retested.
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2015 | 11/20/2015 | 11/20/2015 | P | PASS |
Jim Page
|
|
|
200 psi hydrostatic test passed/complete for the 2 overhead wet systems.
|
INSP-Supply line flush | 11/18/2015 | 11/19/2015 | 11/19/2015 | A | DONE |
Jim Page
|
|
|
Underground flush for fire sprinkler main pssed/complete
|
INSP-Supply line flush | 11/9/2015 | 11/13/2015 | 11/12/2015 | A | CANC |
Jim Page
|
|
|
UG Flush Please call Perly 30 min prior ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Scott Carter II
|
INSP-Sprinkler Rough-in | 10/14/2015 | 10/15/2015 | 10/15/2015 | A | PASS |
Jim Page
|
|
|
Underground rough-to cover inspection passed/complete, approved for cover
|
INSP-Sprinkler Rough-in | 10/2/2015 | 10/2/2015 | 10/2/2015 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for hard lids on first floor passed/complete, approved to cover first floor hard lids.
|
INSP-Sprinkler Rough-in | 10/1/2015 | 10/1/2015 | 10/1/2015 | P | FAIL |
Jim Page
|
|
|
Contractor requested inspection for rough to cover inspection on the hard lids, no hard lids approved for cover until upright head coverage is adjusted/corrected, multiple pockets above hard lids not covered and upright heads overspaced.
|
Permit Ready to Issue | | | 10/1/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/1/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/1/2015 | | 10/1/2015 | | DONE |
Brittany Hill
|
|
|
|
Sprinkler Plan Check | 9/30/2015 | | 9/30/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2015 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 9/21/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 9/11/2015 | | 9/11/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 9/11/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 9/1/2015 | | 9/1/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 9/1/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 9/1/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 8/28/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/28/2015 | | 8/28/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/26/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 26 2015 10:23AM
|