Permit Information
Permit NumberFIR15-00603
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 111 S BROADWAY AVE
Project Name111 BROADWAY NORTH BUILDING
Customer Number 
ePlanReviewYes
Description
[111 Broadway North Building]
The fire sprinkler scope of work consists of protecting a shell with a wet system. The system is design as a center rail, grid with a primary main branch line. The system is design for 3000 ft^2 due to an adjoining combustible crawl space. The system is supplied by 6”x245’± C-900 underground with associate fittings and thrust blocks. The 6”riser has a 6” backflow preventer with wall PIV. The three mains are 4” The primary main branch line is 6”and 4”. The branch piping is 2”

(111 BROADWAY – Shell and Core – North Bldg) Permit is to remodel and partially demolish an existing 10,223 square foot building. Demolition includes the removal of the 2,665 NE building that was previously considered part of this building and remodeling the remaining 4,893 square feet. Remodel consists of a complete exterior façade remodel including new soffits and storefront. Scope of work includes: interior demolition, new mechanical, new plumbing, new electrical, installation of a new sprinkler system, exterior soffits, new storefronts, remodel one restroom to become fully accessible (the other restrooms will be remodeled with tenant improvements), and interior finishes. At the competition of this project the building will be Fully Fire Sprinklered. NOTE: Separate Building Permits are required prior to occupying this space. No tenant improvement permits will be issued until non-build agreement is recorded and approved by the City of Boise Legal Dept. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/2/201512/3/201512/3/2015APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in11/3/201511/3/201511/3/2015PPASS
DetailsTroy Cobbley
The piping to the two pendant heads above the restrooms is ok to cover.
INSP-Sprinkler Rough-in/Hydro10/29/201510/29/201510/29/2015PPASS
DetailsJim Page
200 psi hydrostatic test passed/complete for overhead fire sprinkler piping.
INSP-Conference10/20/201510/21/201510/21/2015ADONE
DetailsJim Page
Conference complete
INSP-Sprinkler Rough-in10/7/201510/7/201510/7/2015PPASS
DetailsJim Page
Fire sprinkler Rough in inspection passed/complete
Permit Ready to Issue  9/8/2015 DONE
all requirments met
Issue and Print Permit  9/8/2015 DONE
Inspection Record Card- Fire9/8/2015 9/8/2015 DONE
DetailsCarlos Velazquez
Sprinkler Plan Check9/4/2015 9/4/2015 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  9/4/2015 DONE
DetailsTim Frost
Intake Approval  9/1/2015 PASS
Plan assigned to (Tim)9/1/2015 9/1/2015 DONE
DetailsTim Frost
Sprinkler Plan Check9/1/2015 9/1/2015 FAIL
DetailsTim Frost
1st review completed  9/1/2015 FAIL
DetailsTim Frost
Application received  8/26/2015 DONE
Application submitted via PDS Online on Aug 26 2015 12:19PM